Status Report for Week 12


  1. Tasks accomplished
    1. Finalized the tasks that will be performed by the user for testing.
    2. Started working on the user survey used for collecting data regarding the test.
    3. User Survey will contain both qualitative and quantitative data.
    4. Quantitative data is prioritized, data analysis will be done using statistical analysis software.
  2. Tasks In Progress
    1. User Survey will be finalized.
    2. A software for statistical analysis will be confirmed. (Currently SAS is the primary option).
    3. Date of user testing is being decided upon.
  3. Tasks Planned For the Next Two Weeks
    1. Develop the final version of the Multiply Madness application.
    2. Conduct the user testing and collected data.
  4. Issues
    1. None so far.
  5. Metrics
    1. Our group has contributed to the deliverables fairly evenly.
    2. Testing metrics will be decided contribution to the user testing plan and survey. Data analysis will be the sole duty of one of the members. Furthermore, two members (minimum) will be required to attend the actual testing.

Monday, April 14, 2014

Status Report for Week 10

The following objectives were met in the previous weeks:

1. Successfully completed the beta version of the application to be used for user testing.

2. A usability test plan was made for preliminary preparation.

3. Heuristic evaluations for the Multipy Madness application was completed.

Tasks to be completed:

1. Finalizing the test plan for the application.

2. Execution of the actual test plan.